Skip to content
Specialist remediation, from survey to reinstatement, since 1984
White Knight Service GroupInstruct a survey
Back to Sectors

Facilities management

For hard FM providers and in-house facilities teams who need a specialist contractor that keeps the rest of the building operating, with paperwork ready before work starts and the area made good before handover.

What you receive on every instruction

01

RAMS and documentation as standard

Risk assessments and method statements provided before work begins.

02

Contained work areas

Negative-pressure containment so adjacent areas can stay in use.

03

Low-disruption methods

SteraMist disinfection and dry ice blasting clean and decontaminate without saturating the area in water.

04

Clearance, then reinstatement

Verification before an area returns to use, then, where needed, making good by the same contractor, with a report for your own client.

Water ingress, flooding in a plant room, a sewage or biohazard incident, mould found during planned maintenance: FM triggers usually come with a building that has to keep operating and occupiers who need to stay safe. We work as a specialist subcontractor to hard FM providers, and direct with in-house estates and facilities teams, on that basis.

RAMS and, where the job needs it, a scope of works are provided before we attend, so the work fits your own permit and accreditation processes without delay. We’re SafeContractor accredited.

Work areas are contained, typically under negative pressure, so the rest of the building can stay in use while we work. Where water isn’t wanted near sensitive equipment or finishes, SteraMist disinfection and dry ice blasting clean and decontaminate without saturating the area. Every job closes with clearance testing before the space is handed back, and a report you can pass to your own client.

Relevant services

Our protocol

OXID-8/B-RINSE: a two-stage decontamination methodology

How OXID-8 works
Method sheet
Methodology
OXID-8 / B-RINSE
Containment
Negative pressure, HEPA filtration
Verification
In-house laboratory
Clearance
ATP surface testing and air sampling

Common questions

What paperwork do you provide before starting?

RAMS and, where relevant, a scope of works, provided ahead of attending site.

Can the rest of the building stay in use?

Usually, work areas are contained, typically under negative pressure, so neighbouring space can generally stay occupied. This is confirmed on site for the specific job.

Are you accredited for FM procurement portals?

WKSG is SafeContractor accredited.

Have a property that needs assessing?

Tell us about the site and a technical lead will come back to you.