Commercial property
For property owners, managing agents, asset managers and developers who need to know the true extent of a damp, mould or dry rot problem before committing to costly strip-out, and one contractor to put it right afterwards.
What you receive on every instruction
01
Investigation before removal
Moisture mapping, targeted openings and laboratory sampling establish extent, so only affected materials are removed.
02
Documented findings
Photo-documented reports suitable for asset records, insurance claims or a dispute.
03
Work around occupied buildings
Remediation planned around tenants and trading businesses.
04
Clearance and reinstatement
Verification before handover, then, where needed, making good and finishes by the same contractor.
A void period, a tenant complaint about damp or air quality, a new-build defect, an insurance claim: commercial property problems usually carry a cost question before a technical one: how much of the building is actually affected, and what it will cost to put right. Committing to strip-out before you know the answer risks removing more than you need to, or missing what’s driving the problem.
We investigate first. Moisture mapping, targeted openings and laboratory sampling establish the extent of damp, mould or dry rot before any wider removal, so the scope reflects what’s actually there. Our hotel refurbishment case study shows this in practice: targeted openings identified affected areas, sound sections were treated and retained in place, and the works were scoped and phased around a trading building rather than a blanket strip-out.
Findings are photo-documented and set out clearly enough to support an insurance claim, a dilapidations schedule or a dispute over a new-build defect.
If you’re planning a refurbishment or fit-out, see our pre-refurbishment surveys: the same investigation approach, used to plan works before contractors are on site rather than in response to a problem already found.
Relevant services
Technical consultancy
Specialist technical advice on mould, decontamination and fire or flood restoration, before, during or after works.
ExploreDry rot
Root-cause investigation, remediation and reinstatement for dry rot, with the extent verified before removal begins.
ExploreEnd-to-end service
Survey, remediation, verified clearance and reinstatement from one contractor, with one point of accountability from first visit to handover.
ExploreMould remediation
Root-cause investigation, contained removal, lab-verified clearance and reinstatement from one contractor.
ExplorePre-refurbishment surveys
Find hidden mould, damp and dry rot before strip-out, so it's scoped and priced up front.
Explore- Methodology
- OXID-8 / B-RINSE
- Containment
- Negative pressure, HEPA filtration
- Verification
- In-house laboratory
- Clearance
- ATP surface testing and air sampling
Common questions
Can you establish the extent of a problem before we commit to strip-out?
Yes, moisture mapping, targeted openings and laboratory sampling identify how far a problem has spread before wider removal begins. Our hotel refurbishment case study shows this approach limiting the works to the affected areas.
Can you work around tenants or a trading business?
Yes, remediation is planned and contained around occupied or trading space; see our approach to phased, targeted work in the hotel case study.
What do we receive at the end of the works?
A clearance report with test results, confirming the area is fit to return to use or hand over.
Have a property that needs assessing?
Tell us about the site and a technical lead will come back to you.