Skip to content
Specialist remediation, from survey to reinstatement, since 1984
White Knight Service GroupInstruct a survey
Back to Sectors

Hospitality and hotel groups

Mould and dry rot in hotels often stay out of sight until bathrooms, floors or wall linings are opened up. We help hotel groups find problems before a refurbishment programme does, deal with them room by room while the hotel keeps trading, and reinstate the rooms ourselves so they go straight back into service.

What you receive on every instruction

01

Pre-refurbishment surveys

Moisture mapping, targeted openings and laboratory sampling before strip-out begins.

02

Room-by-room remediation

Contained, negative-pressure work areas so neighbouring rooms stay in service.

03

Clearance and evidence

ATP surface testing and laboratory air sampling before rooms return to use, with photo-documented reports for your asset records.

04

Bathroom and room reinstatement

Where needed, rooms made good and finished by the same contractor, ready to return to service.

Bathrooms, floor voids and wall linings in hotels can hide mould and dry rot for years, concealed by finishes, and found only when a refurbishment programme opens them up. By then, the discovery is competing with a live programme, rooms out of service, and a fixed handover date.

We help hotel groups find these problems earlier. A pre-refurbishment survey, run ahead of a room or floor refurbishment, uses moisture mapping and targeted openings to establish what’s actually there before the main contractor mobilises; see our pre-refurbishment surveys page. Findings are scoped and priced so they’re part of the programme, not a variation to it.

Where remediation is needed, we work room by room in contained, negative-pressure work areas, so neighbouring rooms can stay in service and the hotel keeps trading. Our hotel refurbishment case study sets out how this looked in practice: targeted openings established the extent of a dry rot outbreak, sound sections were treated and retained rather than stripped out wholesale, and the works were phased around a trading building.

Every instruction closes with clearance testing before a room is handed back, and a photo-documented report for your asset records. See our mould remediation and dry rot services for how we approach each specific defect.

Relevant services

Our protocol

OXID-8/B-RINSE: a two-stage decontamination methodology

How OXID-8 works
Method sheet
Methodology
OXID-8 / B-RINSE
Containment
Negative pressure, HEPA filtration
Verification
In-house laboratory
Clearance
ATP surface testing and air sampling

Common questions

When should we commission a survey?

Ideally before the refurbishment programme is fixed, so findings can be scoped and priced in.

What happens if you find something during a routine refurbishment?

Findings are reported with photographs and laboratory results so the extent is clear before any decision is made on widening the scope.

How do you document findings for our asset management team?

A photo-documented report and laboratory results are provided for every instruction, suitable for a hotel group's own asset and compliance records.

Have a property that needs assessing?

Tell us about the site and a technical lead will come back to you.